SE 43rd Avenue Bridge Replacement Over Relief Canal

SE 43rd Avenue Bridge Replacement Over Relief Canal

Okeechobee County, Florida

OM Engineering completed this FDOT District 1 project as a subcontractor to WGI, Inc. We performed transportation and structural design services, as well as construction services, as part of this contract. The project involved aspects of roadway design to accommodate the approaches to the new bridge, structures (e.g., the bridge and retaining walls), utility coordination, drainage and stormwater, and permitting. The new 47-ft single span, 45-ft wide pre-stressed slab bridge was designed according to FDOT Structures Design Manual and AASHTO LRFD Specifications and was constructed using AASHTO Type II prestressed girders. The design accommodates two-phase construction in order to maintain at least one lane open to traffic during construction.